Lincolnton Waste Water Treatment Facility
Stephenson Regional Pumping Station
|
||||||||||||||||
Lincolnton Waste Water Treatment Facility Lift Pump Replacement & Upgrades - Lincolnton, NC Design of electrical systems for the replacement of 3 pumps. The electrical work included: Layout of motor control centers, selection variable frequency drives, feeder sizing calculation and technical specifications. Design of electrical systems for the upgrade to and existing water treatment facility. The electrical work included: Variable frequency drives for motors, including the 700 HP high service pump, modifications to the existing switchgear, cable tray for power distribution, lighting design, available fault calculations, control wiring and layout of motor control centers. Stephenson Regional Pumping Station, Frederick County, VA Project was to design a new sanitary pumping station. Electrical design included: New electrical service, provisions for a portable generator for emergency power to the process, lighting for the building and the site, power to the process equipment, general purpose power and connections to HVAC equipment. Water Treatment Facility, Luray VA Project was to design a new water treatment facility for the Town of Luray. Electrical design included: New electrical service, reuse of an existing generator on the site for emergency power to the process, lighting for the building and the site, power to the process equipment, process control, general purpose power and connections to HVAC equipment.
For More Information Please Contact Us |